How we work

What it's actually like to
work with us.

How a project runs, who you talk to, when you can reach us, how work is checked, and how
to leave if you want to. This is the process we actually run, not an ideal one.

On a tight deadline? Lead with the date.

Tell us when you need it before anything else. We confirm within [ 4 ] working hours whether we can hold that date, and if we can, production starts the same day. Small permit sets and tenant improvements are routinely turned in [ 2–5 ] business days. If we can’t hit it, we say so immediately rather than accepting and slipping.

On fast-track work

The process

How a project runs

These are the steps, not a calendar. The dates are fixed in your proposal, sized to your project and your
deadline.

You send

Backgrounds, scope and your target date

Mutual NDA first if you’d rather. No call needed to get a number.

Within 24 hrs

Lump-sum fee and a committed delivery date

Scope, assumptions, exclusions and included markup rounds, all in writing. Either we commit to your date or we tell you the earliest one we can hold.

Before we start

Where the drawings leave something open, we ask

Ceiling heights that aren’t shown, a service location that’s ambiguous, a fixture count that doesn’t reconcile. A short written list, answered by email or on a 20-minute call. Asking now is cheaper than assuming and redrawing.

Production

Engineering and drafting, to the agreed standards

Written status at each milestone: done, next, blocked. Revisions clouded and deltas numbered to your convention.

Before you see it

Two-stage internal QA/QC

Discipline lead, then senior engineer. You receive a checked package, not a first draft with our mistakes still in it.

Your review

You mark it up, we incorporate

Bluebeam markups or redlined PDFs, whichever you use. [ Two ] rounds included in the lump sum, with the count stated in your proposal so nobody is guessing.

Delivery

Native files and a flattened PDF set, on the committed date

Native DWG or RVT, a signed-ready PDF set named to your sheet convention, the calculation set, and a QA/QC sign-off sheet. Submittals and RFIs handled after issue if you want us to stay on it.

No documented standards? That's normal, and it's not a problem.

Plenty of firms under twenty people have never written their standards down. Nothing here depends on you having a
template.

You have standards

You have past sets

You have neither

From your second project on, it gets shorter

Standards are settled once. The same engineers are already on your account and already know how you like things
drawn.

You send drawings

Fee within 24 hours

Production starts same day

Who you'll deal with

You deal with engineers, not account managers

You’re put in direct contact with the mechanical, electrical and plumbing engineers working on your job — by email 
and on calls. They know the model, the calculations and the reasoning behind every decision on it.

That means an answer comes from the person who made the call, not from a coordinator taking a message and
forwarding it. No relaying, no waiting a day to find out your question was misunderstood.

Direct, by discipline

Email and calls straight with the mechanical, electrical or plumbing engineer, depending on what you're asking about.

Answers, not relays

Whoever replies has the project open in front of them and made the decision you're asking about.

One person accountable

Direct access to engineers doesn't mean nobody's in charge. The principal signs off every engagement.

And I stay above all of it

Fees, scope, priorities and anything that needs a decision from the firm come to me — usually the same day. You never have to work out who to ask. Ask either of us and it lands in the right place.

Availability

We work to your clock, not ours

Our team is in India, which means one of these windows is our evening and the other is our early morning. We
staff both. Pick the one that suits your day and it becomes your standing window.

8:00 – 11:00 AM CT

Every business day. Catches you before the day fills up, and gives us your afternoon to act on whatever we discussed.

7:00 – 10:00 PM CT

If your day is wall-to-wall, take the call after it. Same engineers, same agenda, no difference in what gets done.

Outside both windows, when something's urgent

You get direct mobile and WhatsApp for your project engineer and for Hemin at kickoff. If a deadline moves or something breaks, you don't wait for a window — you call.

The rest of the time

Every email answered within one U.S. business day
Written status at each milestone: done, next, blocked
Files through your ACC or BIM 360, or ours

Markups in Bluebeam, returned as PDF and native
Work continues through your afternoon and our night
Times shown in Central — we track U.S. daylight saving so you don't have to

Quality

Two stages, before anything reaches you

This is not compressed on fast-track work. If the schedule can’t carry both stages, we quote a date that
can.

Stage 1 — Discipline lead

Model and drawing check against our standing checklist
Layer, family and naming compliance to the agreed standards
Sheet set completeness, tags, schedules and legends
Cross-sheet consistency and reference checks

Stage 2 — Senior engineer

Code review against the governing edition and AHJ amendments
Calculation verification and sizing sanity checks
Cross-discipline coordination and clash review
Constructability and access for maintenance

We flag what we find. You decide what to do with it.

If a duct route won't fit above the ceiling, a panel is undersized, or a fixture count fails IPC, you get a redline and a proposed fix rather than a drawing of the problem. Reviewing your input is part of the scope, not an extra — but the decision stays yours.

Commercial

Fees, invoicing and scope changes

Lump-sum per project

Fee and delivery date agreed before work starts. Scope, assumptions, exclusions and markup rounds in writing.

Block hours

Prepaid hours across any project or discipline, with a monthly burn report.

Dedicated team

Named engineers assigned monthly, with a named backup on your account.

Invoicing

[ Terms — e.g. 50% on award, 50% on delivery. Net 30. ] Invoiced in USD from our U.S. bank account by NexMEP Global LLC, a Texas company. W-8BEN provided on request.

Scope changes

Markups beyond the included rounds, or a change in scope, get a written adjustment before we continue. You approve the revised fee and date first.

Your data

Where your files live, and how you get them back

While we're working

Mutual NDA before the first file transfers
Files on your ACC or BIM 360, or our controlled environment — your choice
Company machines only. No personal devices, no removable media
Backed up three ways: local server, two separate on-site drives, and cloud storage
Access granted per project, revoked at closeout
You own the model, drawings, families and every file we touch

If you want to stop

You can end an engagement at any time, for any reason
Work in progress delivered in native format within [ 5 ] business days
You're invoiced only for work completed to that point
Files returned or destroyed on your written instruction
No lock-in, no notice period, no held files

When something goes wrong

Errors in our work

A date at risk

Escalation and liability

Questions

Everything else principals ask

What happens when the architect reissues backgrounds?

We re-link and report the impact before doing the work. If the change affects sheets already complete, you get a written adjustment to fee and date for approval first. Minor background updates within the agreed scope are absorbed.

Do Indian public holidays affect our schedule?

Our holiday calendar is shared at kickoff and every committed date is planned around it. If a holiday falls inside your programme, you'll know before you sign, not the week it happens.

How many markup rounds are included?

[ Two ] on a lump-sum project, stated in the proposal. Beyond that we agree a written adjustment before continuing rather than invoicing you a surprise.

How many projects can you take at once?

Current capacity and lead time are confirmed in every proposal. If we're full, we say so rather than accepting your job and letting it slip.

We don't have a template. Does that matter?

No. We'll match a previous set of yours, or use our own standards. Either way you get consistent output, and it becomes your standard with us from then on.

Can we start with one small project?

That's how most firms start, and we'd recommend it. A single set or a discrete study tells you more than any reference call will.

Send us a set of drawings.

You’ll have a lump-sum proposal within 24 hours. No call required first, and a
mutual NDA is available before you send anything.